All questions added below
Due date is wrong, please submit by Feb. 26th 2025
Questions:
Wanted to confirm RFP due date of April 1st, 2025? We understand the due date for filling e-rate is March 26th
Thanks for that as I was told wrong dates and have not done this before as others did it before me.
I am fixing date to Feb.26th, 2025
How would this be billed through E-rate — We use the SPI and as such you would charge us monthly on the parts we are responsible for.
Would SHRLS accept a hub and spoke design? This design would interconnect your libraries via a WAN and share a larger, single Internet access service at the Rome location (205 Riverside Parkway, Rome, GA) with a single firewall and filtering service as an alternative to six individual Internet access services with six different firewall and filtering services. Yes as long as we see a full write up in the proposal on it.
Could you please confirm that this is the amount of Internet bandwidth that you want at each of your Library facilities for this RFP?
| ROME/FLOYD – 205 Riverside Parkway, Rome GA. 30161 | 500MEG |
| CAVE SPRING – 17 Cedartown Street, Cave Spring, GA 30124 | 100MEG |
| CEDARTOWN – 245 East Ave. Civic Complex, Cedartown, GA 30125 | 200MEG |
| ROCKMART – 316 N Piedmont Ave. Bldg. 201, Rockmart, GA 30153 | 200MEG |
| CHATTOOGA – 360 Farrar Drive, Summerville, Georgia 30747 | 200MEG |
| TRION – 15 Bulldog Boulevard, Trion, Georgia 30753 | 100MEG |
Yes that is the minimum required. 2 branches are very tiny.
